Route 19

Located at 8518 and 8600 Lake Street Road in Leroy, NY, Route 19 North and West are co-located sites on adjacent properties with shared access and parallel points of interconnection. The project sites required extensive earthwork, including several acres of grading to accommodate the single-axis tracker racking system and to establish stable foundations across varying terrain. In addition, three engineered bioretention basins—strategically located at each equipment pad—were constructed to effectively manage stormwater runoff, improve onsite drainage, and meet all state and local environmental compliance requirements.

Project Value to Community

  • Generates ~15,074 MWh of clean electricity each year
  • Offsets ~5,628 metric tons of CO₂ annually — the equivalent of powering ~1,400 U.S. homes for a year
  • Displaces greenhouse gas emissions equal to taking ~1,200 cars off the road every year